Travaux d'installation des plaques solaires au niveau des bassins de traitement des eaux usées de BUTERERE

Summary

Under the Urban Resilience Emergency Project, works are being procured to install a 460 kWp grid-connected solar PV plant with a 250 kW/500 kWh battery storage system, together with two mobile sludge discharge pumps at a wastewater treatment station. The tender is run as a National Competitive Bidding procedure and is open to all eligible bidders.